terug naar productenlijst
Erasmus | Mars Renewable
Erasmus – C&I Hybrid Solution
Market Insights/ Pain Points
- The Netherlands has 15,000+ dairy farms, a key pillar of Europe’s dairy production.
- Farms face grid congestion and rising electricity costs, while the Net Metering scheme will be cancelled by the end of 2026, increasing the need for self-consumption and energy independence.
- Erasmus has already been widely deployed in farms and dairy operations, with multiple projects running successfully.
Solution
- Plug & Play: Pre-wired and pre-crimped design with quick connectors for fast and simple installation.
- Small Body, High Performance: 314Ah high-energy-density cells, +11 kWh capacity, and intelligent liquid cooling delivering 40% longer cycle life.
- One Unit Fits All Needs: PV DC coupling support, diesel generator ready, and 10 ms seamless on/off-grid switching for reliable backup power.

Over ons
Mars Renewable specializes in BESS project development and provides integrated energy storage solutions for C&I and utility-scale applications. Combining advanced battery insights, strong integration R&D, and optimized application strategies,




